TP II.3 System integration of 70 GW wind
Sub-project in Innovation Area II – Sustainable maritime spatial planning and use of the German Bight
When large wind structures such as low-pressure areas and fronts move through offshore wind farms, this poses a major challenge for the electrical grid due to the scale of the affected power that needs to be integrated.
For this reason, system integration requirements are being defined for the modeling of yields. On this basis, the modeling and analysis methods for the time-dependent analysis of generation potentials are improved.
Scientists responsible
- Dr. Bernhard Stoevesandt, Fraunhofer IWES